Reps

File: House of Representatives

The House of Representatives has urged the Federal Ministry of Works to direct Rock Result Nigeria Limited to immediately return to site and rehabilitate or reconstruct failed box culverts along the East-West Road, particularly at Iheke in Ahoada East Local Government Area of Rivers State.

The House also called for an independent engineering assessment of the damaged structures and proper technical supervision of the remedial works to ensure compliance with approved construction standards and prevent further failures.

The resolutions followed a motion moved by the member representing Yenagoa/Opokuma Federal Constituency of Bayelsa State, Oboku Oforji, at plenary on Wednesday.

Moving the motion, Oforji recalled that the House had, on October 3, 2023, adopted a resolution drawing attention to the deplorable condition of the East-West Road, particularly the Iheke section, prompting subsequent Federal Government interventions.

He commended the government for its interventions, which included the construction of box culverts, approval of funds for rehabilitation and flood mitigation works, release of funds to Rock Result Nigeria Limited and the re-award of the contract to Setraco Nigeria Limited for the continuation of the road project.

However, he expressed concern that the culverts had deteriorated despite the substantial financial commitments made by the Federal Government.

The lawmaker attributed the structural failures to alleged substandard execution of the construction works, questioning the quality of materials used, compliance with engineering specifications, project supervision and the value derived from public funds invested in the project.

Oforji described the East-West Road as a major economic and social corridor connecting Bayelsa, Rivers and Delta states, as well as other parts of the country.

He noted that the road served several communities and essential institutions, warning that its continued deterioration threatened the safety and livelihoods of residents, motorists, businesses and other road users.

He further warned that the damaged culverts could “endanger lives, disrupt the movement of people and goods, and aggravate flooding and erosion in the region if urgent remedial action was not taken.”

Related News

The lawmaker stressed that drainage infrastructure, particularly box culverts in the flood-prone Niger Delta, must meet stringent engineering standards to guarantee durability, safety and resilience.

The motion also highlighted delays in the dualisation of the East-West Road, particularly the Ahoada-to-Bayelsa axis extending to Patani in Delta State.

According to Oforji, the project, “initially scheduled for completion in April 2025, was subsequently extended to November 2025 but remained unfinished as of November 25, 2026.”

Following the adoption of the motion, the House urged the Ministry of Works to direct Rock Result Nigeria Limited to return to site and undertake the rehabilitation or reconstruction of the failed culverts in accordance with approved engineering specifications.

It also called on the ministry to ensure effective technical supervision, quality assurance and an independent engineering assessment of the remedial works.

The lawmakers further urged the ministry to ensure that Setraco Nigeria Limited completes the outstanding dualisation works on the Ahoada-to-Bayelsa and Patani sections of the road.

To ensure compliance, the House mandated its Committee on Works and Legislative Compliance to monitor the implementation of the resolutions and report back within four weeks for further legislative action.

The East-West Road is one of the major federal highways in the Niger Delta, serving as a vital link for the movement of agricultural produce, petroleum-related goods, commercial traffic and passengers across several oil-producing states.

Its poor condition, recurring flooding and prolonged construction delays have repeatedly attracted public complaints and legislative attention, with communities along the corridor bearing the brunt of disrupted transportation and deteriorating infrastructure.

The latest intervention comes amid renewed concerns over the durability of government-funded road projects and the need for stricter monitoring of contractors to ensure that public infrastructure meets approved specifications and delivers value for money.

Source: Punch · Dirisu Yakubu

At a glance

Topic
World
Country
🇳🇬 NG
Publisher language
EN
Added to Allnira